OUR BLOG

Follow our blog if you are interested to find information on general design advice, architectural technical detailing, architectural processes and services, what inspires us from around the world...

  • 1435235033_facebook
  • houzz
  • 1435235153_vk2
  • 1435235026_pinterest
  • 1435234797_instagram
  • 1435554973_twitter2

DANNY BROE ARCHITECT

Search
  • Danny Broe Architect

Architecture Under Construction - Sneak Peek Photos

Updated: Apr 23, 2018

Monthly update from our Construction Sites in Surry Hills, Leichhardt, Camperdown and the new one in Jannali Surry Hills Terrace |WEEK 30|


|WEEK 31|




Leichhardt House |WEEK 60|




Jannali House

  • The proposal is to remove the existing swimming pool at the rear and extend the living/dining room creating big windows to frame the sandstone wall.

  • Addition of an upper level living area and a deck to connect to rear garden

  • The use of glass and voids will help to connect visually and functionally the 3 levels of the house

  • new contemporary look outside and inside with open plan spaces

  • clerestory window above the kitchen to fill the house of sun

Before:

Proposal:

Under Construction:

|WEEK 1| preparation of the site

|WEEK 2| demolition and construction of the concrete slab



0 views
DBA2018.png